Merge pull request #1535 from rzetelskik/1.11-myst-switch #5942
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
go.yaml
on: push
Build images
4m 45s
Verify
4m 12s
Verify dependencies
24s
Build and test
7m 3s
Build Helm charts
26s
Verify vendorability
0s
Test e2e parallel
47m 4s
Test e2e serial
23m 10s
Test e2e parallel (with alpha features)
1h 22m
Test e2e serial (with alpha features)
21m 53s
Failure notifications
2s
Annotations
1 error
Test e2e parallel (with alpha features)
The hosted runner: GitHub Actions 3 lost communication with the server. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
e2e-artifacts-parallel.tar.lz4
Expired
|
34.7 MB |
|
e2e-artifacts-serial-alpha.tar.lz4
Expired
|
7.77 MB |
|
e2e-artifacts-serial.tar.lz4
Expired
|
7.9 MB |
|
helm-charts.zip
Expired
|
133 KB |
|
operatorimage.tar.lz4
Expired
|
121 MB |
|