Go #5935
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
go.yaml
on: schedule
Build images
3m 0s
Verify
4m 21s
Verify dependencies
39s
Build and test
7m 36s
Build Helm charts
12s
Verify vendorability
0s
Test e2e parallel
47m 9s
Test e2e serial
27m 27s
Test e2e parallel (with alpha features)
1h 2m
Test e2e serial (with alpha features)
23m 6s
Failure notifications
1s
Annotations
1 error
Test e2e parallel (with alpha features)
The hosted runner: GitHub Actions 3 lost communication with the server. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
e2e-artifacts-parallel.tar.lz4
Expired
|
33.7 MB |
|
e2e-artifacts-serial-alpha.tar.lz4
Expired
|
7.93 MB |
|
e2e-artifacts-serial.tar.lz4
Expired
|
8.23 MB |
|
helm-charts.zip
Expired
|
133 KB |
|
operatorimage.tar.lz4
Expired
|
121 MB |
|