Update dependency goreleaser/goreleaser to v2.6.1 #10652
ci.yml
on: pull_request
Checks and variables
1m 36s
Matrix: Build OSS images
Matrix: Helm Tests
Waiting for pending jobs
Matrix: Conformance tests
Matrix: Functional tests
Package and Publish Helm Chart
0s
Annotations
4 errors
Conformance tests (plus, v1.32.0, false) / Run Tests
buildx failed with: ERROR: failed to solve: maximum timeout reached
|
Conformance tests (nginx, v1.32.0, true) / Run Tests
buildx failed with: ERROR: failed to solve: maximum timeout reached
|
Conformance tests (plus, v1.25.16, true) / Run Tests
buildx failed with: ERROR: failed to solve: maximum timeout reached
|
Conformance tests (plus, v1.25.16, false) / Run Tests
buildx failed with: ERROR: failed to solve: maximum timeout reached
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
conformance-profile-nginx-v1.25.16
|
768 Bytes |
|
conformance-profile-plus-v1.32.0
|
766 Bytes |
|
cover-12904793218.html
|
191 KB |
|
nginx~nginx-gateway-fabric~JBCRHU.dockerbuild
|
69.9 KB |
|
nginx~nginx-gateway-fabric~U8QJM2.dockerbuild
|
92.6 KB |
|
nginx~nginx-gateway-fabric~XOAI1G.dockerbuild
|
62.9 KB |
|
scan-results-ngf
|
12.2 KB |
|
scan-results-nginx
|
109 KB |
|
scan-results-plus
|
763 Bytes |
|