Refactor Config Apply Data Plane Response (#904) #4253
ci.yml
on: push
Build Unsigned Snapshot
2m 33s
Lint
4m 54s
Unit Tests
2m 26s
Unit tests with race condition detection
2m 42s
Performance Tests
5m 13s
Matrix: Integration Tests - Official OSS Images
Matrix: Integration Tests - Official Plus Images
Matrix: Integration Tests
Publish NGINX Agent v3 packages
/
Set workflow variables
2s
Publish NGINX Agent v3 packages
/
Update Release Draft
4s
Publish NGINX Agent v3 packages
/
Upload packages
13m 53s
Publish NGINX Agent v3 packages
/
Merge release branch back into V3 branch
0s
Annotations
5 errors
Integration Tests (alpine, 3.19)
Process completed with exit code 2.
|
Integration Tests (redhatenterprise, 9)
The job was canceled because "alpine_3_19" failed.
|
Integration Tests (redhatenterprise, 9)
The operation was canceled.
|
Integration Tests (ubuntu, 22.04)
The job was canceled because "alpine_3_19" failed.
|
Integration Tests (ubuntu, 22.04)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
load-test-results
Expired
|
385 Bytes |
|
nginx-agent-unsigned-snapshots
Expired
|
108 MB |
|