Skip to content

Commit

Permalink
Update 2024-12-09-Eudoxys_Verdant_Partner_On_CEC_Electrification_Anal…
Browse files Browse the repository at this point in the history
…ysis.md
  • Loading branch information
dchassin authored Dec 9, 2024
1 parent 232515f commit 8893659
Showing 1 changed file with 1 addition and 1 deletion.
Original file line number Diff line number Diff line change
Expand Up @@ -7,6 +7,6 @@ tags: [Events]

*Eudoxys Sciences LLC partners with Verdant Associates to provide technical assistance to the California Energy Commission.*

To buildout the state’s electric distribution grid model to support the CEC in assessing various electrification and distributed energy resource (DER) adoption scenarios. Eudoxys Sciences LLC has teamed up with [Verdant Associates](https://verdantassoc.com/) to use the open-source software Arras Energy, and evaluate the reliability, equity and cost implications of emerging DER integration strategies. Eudoxys will lead the distribution system modeling and staff training using the tool developed under this project to analyze current and future data as the electric distribution grid evolves.
[Verdant Associates](https://verdantassoc.com/) and Eudoxys Sciences LLC will build the state’s electric distribution grid model to assist the CEC in assessing various electrification and distributed energy resource (DER) adoption scenarios. Eudoxys has teamed up with Verdant to use the open-source software Arras Energy, and evaluate the reliability, equity and cost implications of emerging DER integration strategies. Eudoxys will lead the distribution system modeling and staff training using the tool developed under this project to analyze current and future data as the electric distribution grid evolves.

See [CEC RFP-24-801](https://www.energy.ca.gov/solicitations/2024-10/rfp-24-801-distributed-energy-and-electrification-analysis) for details.

0 comments on commit 8893659

Please sign in to comment.