Merge pull request #3252 from skyleo/crit-per-luk-fix #156
controller.yml
on: push
hwsapibot
/
hwsapi
4m 4s
Matrix: codeql / Analyze
Matrix: build / build
Matrix: clang15_test / build
Matrix: gcc_test / build
Matrix: gccold1 / build
Matrix: gccold2 / build
Matrix: gccold3 / build
Matrix: gccsnapshot_test / build
Matrix: mariadb / build
Matrix: mysql / build
Annotations
4 errors
clang15_test / build (clang-15, --with-http_parser=llhttp, --disable-manager, --enable-packetver=20221024)
The job running on runner GitHub Actions 13 has exceeded the maximum execution time of 60 minutes.
|
clang15_test / build (clang-15, --with-http_parser=llhttp, --disable-manager, --enable-packetver=20221024)
The operation was canceled.
|
gcc_test / build (gcc, --disable-renewal, --enable-packetver-zero, --disable-manager, --enable-packetver=202...
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 60 minutes.
|
gcc_test / build (gcc, --disable-renewal, --enable-packetver-zero, --disable-manager, --enable-packetver=202...
The operation was canceled.
|