ZK-670: client.ts tests #393
on-pull-request-commit.yml
on: pull_request
Check vars and secrets
/
Check available vars and secrets
0s
Measure gas usage
/
Measure circuits
3m 40s
Generate and compile contracts
/
Generate, compile and lint contracts
2m 0s
Deploy contracts
/
Deploy contracts to the anvil network
33s
Rust crates checks
/
Run lints and tests
1m 19s
Rust crates checks
/
Run heavy tests
1m 18s
Clean wasm artifact
3s
Annotations
8 errors
Build wasm packages / Build wasm packages
Canceling since a higher priority waiting request for 'refs/pull/92/merge-PR commit' exists
|
Build wasm packages / Build wasm packages
The operation was canceled.
|
Rust crates checks / Run lints and tests
Canceling since a higher priority waiting request for 'refs/pull/92/merge-PR commit' exists
|
Rust crates checks / Run lints and tests
Process completed with exit code 1.
|
Rust crates checks / Run lints and tests
The operation was canceled.
|
Rust crates checks / Run heavy tests
Canceling since a higher priority waiting request for 'refs/pull/92/merge-PR commit' exists
|
Rust crates checks / Run heavy tests
Process completed with exit code 1.
|
Rust crates checks / Run heavy tests
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
contract-artifacts
Expired
|
5.1 MB |
|
generated-build-cache
Expired
|
5.39 KB |
|
generated-contracts
Expired
|
57.8 KB |
|